DGM 12 Hopper - United Steel Company Grey - Triple Pack ERA_BR Sectorisation Fully sprung metal buffers and
$137.00
Description
Fully sprung metal buffers and factory-installed pipework
Gift cards are delivered by email and contain instructions to redeem them at checkout
Never before produced in ready-to-run form in any scale
Four bufferbeam variations with different piping configurations
later EE and RSH
DGM 12 Hopper - United Steel Company Grey - Triple Pack ERA_BR Sectorisation Fully sprung metal buffers andDGM 12 Hopper United Steel Company Grey Triple Pack 8 plank, 20 ton Diagram P7. Two types of end stanchion tooled: NER wooden or LNER metal T bar type from 1925 onwards. After 1926, the bottom sections of any remaining wooden stanchions were removed. Side chains were fitted to NER Northern Division examples until 1916 and have been catered for. Two type types of axle box tooled: S4 double axleguard (10" x 5") covering 1909 to 1912 and No. 3 (10" x 5")
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.